Search for more Public Notices in your area
national highways
Traffic

M25 (JUNCTIONS 18-15 AND 21A), M1 (JUNCTIONS 1-5 AND 6A) AND A40 TRUNK ROAD TEMPORARY TRAFFIC RESTRICTIONS

Notice ID: MFN0633789

Notice effective from
12th November 2021 to 12th December 2021

national highways
M25 (JUNCTIONS 18-15 AND 21A), M1 (JUNCTIONS 1-5 AND 6A) AND A40 TRUNK ROAD
TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that National Highways Limited intends to make an Order on the M25 and M1 Motorways and the A40 Trunk Road in the County of Hertfordshire, the Unitary Authority of Buckinghamshire Council, and the London Boroughs of Barnet, Harrow, and Hillingdon under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise: -
1) the overnight closure, in phases, of: -

a) the anti-clockwise carriageway of the M25 between Junction 18 (A404) and Junction 15 (M4 Junction 4B), and all of the slip and link roads leading to and from this length of carriageway;

b) the entire circulatory carriageway (both directions) of Denham Roundabout (M40 Junction 1/A40/A412/A4020);

c) the London-bound carriageway of the A40 between M40 Junction 1 (A40/A412/A4020) and Swakeleys Roundabout (B467), all the roads leading to and from, and all the side roads at junction with, this length of carriageway;

d) both carriageways of the M1 between Junction 1 (A406) and Junction 5 (A41/A4008), and all the roads leading to and from these lengths of carriageway;

e) the link roads connecting from the southbound carriageway of the M1 to both carriageways of the M25 at Junction 6A (M25 Junction 21);

f) the road leading from the clockwise carriageway of the M25 at Junction 21A (A405); and

2) the 24-hour closure of the lay-by adjacent to the carriageway described in 1) c) above.

These measures would be in the interests of road safety while contractors undertake resurfacing, bridge, drainage, street lighting, electrical, geotechnical, and signage works and all associated activities. It is expected that the work would last for approximately 16 months starting on or after Monday 6th December 2021. The overnight closures would take place between the following hours (maximum periods):
Monday - Thursday 22:00 - 05:30
Friday 23:00 - 06:00
Saturday 22:00 - 06:00
Sunday 22:30 - 05:30
with the exception of the M1 Junctions 1 -5 which would take place between 21:00 and 06:00 hours every day.
Please note this is part of an order covering other parts of the network, these closures may take place at any time within the works period. Please check the National Highways website for specific details. The Order would come into force on 4th December 2021 and have a maximum duration of eighteen months, ceasing then or whenever all phases of the work are complete, whichever is sooner. Traffic affected by the closures would be diverted using other junctions on the M25 and M1, and by using the A40, A41, A404, A405, A406, A412, A1081, and B556. Access to the Swaminarayan Temple would be maintained under works supervision.
The temporary closures and diversion routes would be clearly indicated by traffic signs when they are in operation during the works period.
J Downham, an Official of National Highways Limited. Ref: HE/SE/2021/M25/167
National Highways Limited, (Company No. 9346363). Registered Office:
Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ.
A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on
0300 123 5000 or

info@highwaysengland.co.uk

.

https://www.highwaysengland.co.uk


Attachments

MFN0633789.pdf Download

Comments

or Register to leave a comment and/or receive comment alerts.

Related notices